
Cost of Poolside Concrete Construction in Broomfield
Constructing a poolside concrete area in Broomfield, CO, involves various considerations that can impact the overall cost. From the choice of materials to the complexity of the design, understanding the factors that influence pricing can help homeowners plan their budget more effectively.
Factors Affecting Cost
- Material Quality: Higher-quality concrete and finishes increase costs.
- Design Complexity: Intricate designs and custom shapes require more labor and materials.
- Size of the Area: Larger poolside areas will naturally cost more due to increased material and labor needs.
- Site Preparation: The condition of the site and the amount of preparation required can affect costs.
- Labor Rates: Local labor rates in Broomfield, CO, can vary and influence the total cost.
- Permits and Regulations: Fees for permits and adherence to local regulations can add to the overall expenses.
- Additional Features: Elements like decorative stamping, coloring, and lighting can increase the cost.
Average Costs for
Task | Average Cost (Broomfield, CO) |
---|---|
Basic Concrete Pouring (per sq ft) | $8 - $12 |
Stamped Concrete (per sq ft) | $12 - $18 |
Colored Concrete (per sq ft) | $10 - $15 |
Site Preparation (per hour) | $50 - $75 |
Concrete Sealing (per sq ft) | $1.50 - $3 |
Decorative Borders (per linear ft) | $15 - $25 |
Excavation and Grading (per hour) | $75 - $100 |
Permits and Inspection Fees | $200 - $500 |
Understanding these factors and average costs can help homeowners in Broomfield, CO, budget more accurately for their poolside concrete construction projects.